Changes between Version 102 and Version 103 of tele-i

Show
Ignore:
Timestamp:
12/13/12 17:06:37 (7 years ago)
Author:
vpsingh
Comment:

--

Legend:

Unmodified
Added
Removed
Modified
  • tele-i

    v102 v103  
    2525 
    2626   1. [raw-attachment:wiki:UpLoads:LOA_CUG_IR.pdf CUG IR (LOA)] - Letter of Acceptance (LOA) for GSM Mobile Connection Under CUG over IR. 
     27   1. [raw-attachment:wiki:UpLoads:IPv6_adoption-3.pdf IPv6 Adoption] - Adoption of IPv6 network on Indian Railways. Lt. No. 2011/Tele/11(7)/1 Dtd. 30.12.2011 
    2728   1. [raw-attachment:wiki:UpLoads:2011-Tele-11(7)-1.pdf IPv6 Adoption ] - IPv6 Adoption on Indian Railways. Lt. No. 2011/Tele/11(7)/1 Dtd. 24.10.2011 
    2829   1. [raw-attachment:wiki:UpLoads:Guidelines_from_DOT_for_REPC_Clearance.pdf DOT Guidelines (RE)] - Guidelines from DOT for REPC Clearance. Lt. No. 96/RE/141/8 Pt.1 Dtd. 21.10.2011