Changes between Version 77 and Version 78 of tele-i

Show
Ignore:
Timestamp:
05/29/12 12:10:18 (8 years ago)
Author:
vpsingh
Comment:

--

Legend:

Unmodified
Added
Removed
Modified
  • tele-i

    v77 v78  
    33== Letters of 2012 == 
    44 
    5    1. [raw-attachment:wiki:UpLoads:Yardsticks_2012-13.pdf Yardsticks] - Yardsticks for Gazetted staff in Construction Projects in the year 2012-13. Lt.No.2012/E&R/3/1(1) Dtd. 28.05.2012 
     5   1. [raw-attachment:wiki:UpLoads:Yardsticks_2012-13.pdf Yardsticks 2012-13] - Yardsticks for Gazetted staff in Construction Projects in the year 2012-13. Lt.No.2012/E&R/3/1(1) Dtd. 28.05.2012 
    66   1. [raw-attachment:wiki:UpLoads:2012-Tele-15(16)-4.dt.70512.pdf Exch 2012] - Provision of KTS Exchange at Railway Board. Lt.No.2012/Tele/15(16)/4 Dtd. 07.05.2012 
    77   1. [raw-attachment:wiki:UpLoads:SCNP-F.631-12-dtd.27042012.pdf SCNP 2012] - Allocation of 9 MHz Ku-band capacity in Transponder No. 6 on INSAT-4CR to Indian Railways. Lt.No.SCNP/F.631/12 Dtd. 27.04.2012